top of page

Shayne Sajnovic - Director

M.Sc. Mechanical Engineering, CEng UK, CIBSE (Chartered Building Services Engineer),

CEng NZ, MIPENZ – Institution of Professional Engineers of New Zealand

Professional Engineer of Serbia and Montenegro (Ex Yugoslavia)

 

Shayne is managing director of the Elkoms Consulting. Shayne have a hands on involvement with the client/design team liaison and retain overall responsibility for the management of our team’s deliverables and performance.

 

References:

 

Mike Popper – P3R; Chris Cordle  – ESGPLC; Anthony Hall  – Axis Group UK; Paul Kerwick – ESGPLC

Recent Experience

Greenwich Peninsula, London – from Stage 3 to Tender documents  – Residential - 2000 flats. Project value £360 mill (approx. Euro 505 mill).

Greenwich Reach, London, Residential scheme of nearly 1000 flats from Inception to Stage D report  Project value £160 mill (approx. Euro 225 mill).

York Theatre    – Refurbishment of listed building.  Total services redesign. MEP services design that includes energy saving measures and renewable energy sources.

CitizenM Hotels (London Victoria & Dublin St Patrick)

Client: CitizenM Hotels

Redevelopment Press Building at London Victoria Station within 236 Rooms CitizenM Hotel

The Dublin St Patrick citizenM Hotel will consist the demolition of an existing building and construction of a 247-room hotel building, part 4-storey, part 5-storey brickwork and polyester-powder coated framed glazed block facing Bride Street and a 9-storey brickwork and polyester-powder coated framed glazed block at the corner of Bride Street and Peter Street in Dublin, Ireland.

W Hotel, Spain 200,000 ft2 redevelopment of existing site to include for brand flagship 5 star hotel comprising 200 bedroom hotel, 6 restaurants 7 swimming pools including roof top swimming pool and sky bar and public space 

Pan Peninsula, London (1 Millharbour) – £200M development of 724 units within 50 and 42 storey towers, including cinema, health club with pool, restaurant, and cocktail bar for Ballymore with SOM and DMWR architects

Mile End Hospital, London – £15M The new MHU will provide 114 single occupancy rooms

Crucible Theatre – Sheffield, Total refurbishment of the theatre built in 1971

© 2022 by Elkoms Consulting. Created by Boris Sajnovic

bottom of page