top of page

Gallery

The Serbian Goverment Building - Belgrade

Republic of Serbia Goverment

Total refurbishment of  the 12.500sqm, 19th century Building.

 

Complete HVAC installation was replaced. Systems comprise of

FCU’s and all air  air-conditioning systems for: meeting rooms,

press room, salons, Cabinet of the President of Serbia etc.

 

In total 11 all air systems. Heating is provided via District heating

and cooling via Air Cooled chillers.

The Serbian Goverment Building - Belgrade

Client

Location

Belgrade

Role

MEP Detail Design and Coordination

© 2022 by Elkoms Consulting. Created by Boris Sajnovic

bottom of page